The putside porch steps /railings to be replaced were just placed with newer wood with the dissiematted, rotten wood still in place and unsafe little nails creating an extremely unsafe environment
The crown molding was placed in the bathroom with a huge slot , quite visible to the naked eye, and caulking lumped between the two crooked lines
On a Friday afternoon, when walking in my home, most all of the floor tiling had been roomed, apparently by error and Mr. Jackson rudely asked me, "what are you going to do about this"
Mr. Jackson had been very belligerent in conversation earlier since this project started but I was trying to be respectful of him as a Professional and a person
When replacing the lock on my back exterior door, once he so called completed this job, the area looked like a robbery rather a professional job.
All and all, I'm quite dissatisfied with the so called workmanship and the bad attitude displayed not by his workers but Mr. Johnson, himself b